Viewing the historical risk report

This report provides a summary and a detailed analysis of information about the risks in your environment during the specified period.

The high-level summary shows the total number of risks and its distribution by the time the risks have been open. The information is categorized under various headings such as Carried forward, New, Closed, and Still open.

Within these categories, you can see severity wise distribution (high or low) and category wise distribution (recoverability, continuity, and service level agreement) of the risks.

The detailed analysis is displayed in the form of various charts:

To view the historical risk report

  1. Navigation:

    Click Reports (menu bar).

  2. In the Risk > Risk History Report section, click Run or Schedule to receive the report on the specified email address.