Reconnecting DMP DSM paths after the upgrade

After you complete the upgrade for an existing DMP DSM environment or if you have added DMP DSMs during the upgrade, proceed to reconnect the DMP DSM paths:

To reconnect DMP DSM paths after the upgrade

  1. Physically connect any additional paths that were disconnected before the upgrade.
  2. In the VEA, rescan the disks.