Finishing the phased upgrade

Complete the following procedure to complete the upgrade.

To finish the upgrade

  1. Verify that the cluster UUID is the same on the nodes in the second subcluster and the first subcluster. Run the following command to display the cluster UUID:
    # /opt/VRTSvcs/bin/uuidconfig.pl  
    -clus -display node1 [node2 ...]

    If the cluster UUID differs, manually copy the cluster UUID from a node in the first subcluster to the nodes in the second subcluster. For example:

    # /opt/VRTSvcs/bin/uuidconfig.pl [-rsh] -clus 
    -copy -from_sys node01 -to_sys node03 node04
  2. On the second half of the cluster, start VCS:
    # cd /opt/VRTS/install
    # ./installer -start sys3 sys4
  3. Check to see if VCS and its components are up.
    # gabconfig -a
    GAB Port Memberships
    ===============================================================
    Port a gen   nxxxnn membership 0123
    Port b gen   nxxxnn membership 0123
    Port h gen   nxxxnn membership 0123
  4. Run an hastatus -sum command to determine the status of the nodes, service groups, and cluster.
    # hastatus -sum
    
    -- SYSTEM STATE
    -- System          State           Frozen
    
    A  node01          RUNNING         0
    A  node02          RUNNING         0
    A  node03          RUNNING         0
    A  node04          RUNNING         0
    
    -- GROUP STATE
    -- Group    System    Probed   AutoDisabled   State
    B  sg1      node01    Y        N              ONLINE
    B  sg1      node02    Y        N              ONLINE
    B  sg1      node03    Y        N              ONLINE
    B  sg1      node04    Y        N              ONLINE
    B  sg2      node01    Y        N              ONLINE
    B  sg2      node02    Y        N              ONLINE
    B  sg2      node03    Y        N              ONLINE
    B  sg2      node04    Y        N              ONLINE
    B  sg3      node01    Y        N              ONLINE
    B  sg3      node02    Y        N              OFFLINE
    B  sg3      node03    Y        N              OFFLINE
    B  sg3      node04    Y        N              OFFLINE
    B  sg4      node01    Y        N              OFFLINE
    B  sg4      node02    Y        N              ONLINE
    B  sg4      node03    Y        N              OFFLINE
    B  sg4      node04    Y        N              OFFLINE
  5. After the upgrade is complete, start the VxVM volumes (for each disk group) and mount the VxFS file systems.

In this example, you have performed a phased upgrade of VCS. The service groups were down when you took them offline on node03 and node04, to the time VCS brought them online on node01 or node02.

Note:

If you want to upgrade the application clusters that use CP server based fencing to version 6.1 and later, make sure that you first upgrade VCS or SFHA on the CP server systems to version 6.1 and later. And then, from 7.0.1 onwards, CP server supports only HTTPS based communication with its clients and IPM-based communication is no longer supported. CP server needs to be reconfigured if you upgrade the CP server with IPM-based CP server configured.