This example's upgrade path follows:
Move all the failover service groups from the first subcluster to the second subcluster.
Take all the parallel service groups offline on the first subcluster.
Upgrade the operating system on the first subcluster's nodes, if required.
On the first subcluster, start the upgrade using the installation program.
Get the second subcluster ready.
Activate the first subcluster. After activating the first cluster, switch the service groups online on the second subcluster to the first subcluster.
Upgrade the operating system on the second subcluster's nodes, if required.
On the second subcluster, start the upgrade using the installation program.
Activate the second subcluster.
See Performing a phased upgrade using the product installer.