Testing a parallel global cluster configuration
Symantec recommends testing before putting a global cluster configuration into production.
To test a planned failover
- Offline the VCS service group for the database on the cluster at the primary site.
- Online the VCS service group for the database on the cluster at the secondary site.
To test distaster recovery at the recovery site
- Plan downtime to test the disaster recovery configuration.
- Simulate a disaster at the primary site.
For example:
Shut down the hosts and storage arrays at the primary. If you can not shut down the storage arrays, disconnect the replication link between the sites.
- Use VCS to fail over the database to the cluster at the secondary site.
To test failback on the primary site
- Offline the VCS service group for the database on the cluster at the secondary site.
- If the nodes and storage are down, restart the nodes and the storage array at the primary site.
- Reconnect the replication link if it was broken.
- Resynchronize the data from the secondary to make sure the data at the primary site is current.
- Bring the VCS service group online at the primary site.