The following table outlines the high-level objectives and the tasks to complete each objective.
Table: Tasks for recovery using Quick Recovery snapshots
Objective |
Tasks |
---|---|
Verifying hardware and software prerequisites |
|
See Recovery using an Exchange 2010 passive copy snapshot in a Database Availability Group (DAG). |
Reviewing prerequisites for using an Exchange 2010 passive copy snapshot in a DAG |
See Recovery for Exchange 2010 using the VSS Restore Wizard. |
|
|
|
See Post-recovery steps. |
|