Taking over a resiliency group of applications

Takeover is an activity initiated when the production data center is down due to any disaster or natural calamities, and the applications need to be restored at the recovery data center to provide business continuity.

To perform takeover operation on applications

  1. Navigate

    Assets (navigation pane)

    Resiliency Groups

  2. Do one of the following:
    • Double-click the resiliency group for which DR is already configured. Skip to Step 3

    • Right-click the resiliency group for which DR is already configured, and select Takeover.

    • Click the vertical ellipses and select Takeover.

  3. On the resiliency group details page, click Takeover.
  4. Select the target data center, and then click Submit.