Symantec logo
Configuring the I/O scheduler

Veritas recommends using the Linux 'deadline' I/O scheduler for database workloads. Please configure your system to boot with the 'elevator=deadline' argument to select the 'deadline' scheduler. See:

 To determine whether a system is using the deadline scheduler

Look for "elevator=deadline" in /proc/cmdline.

 To configure a system to use the deadline scheduler

  1. Include the elevator=deadline parameter in the boot arguments of the GRUB or ELILO configuration file. The location of the appropriate configuration file depends on the system's architecture and Linux distribution. For x86_64, the configuration file is /boot/grub/menu.lst
  2. Reboot the system once the appropriate file has been modified. See the operating system documentation for more information on I/O schedulers.