Confirm startup (phased or full)
Perform the following steps on each upgraded node.
To Confirm startup
-
If performing a full upgrade, reboot all the nodes.
If performing a phased upgrade, proceed to step 2.
-
Restart all the volumes by entering the following command for each disk group:
# vxvol -g
diskgroup startall
-
Remount all VxFS file systems and Storage Checkpoints on all nodes:
# mount /
filesystem
# mount /
checkpoint_name
-
If the CVM and SFCFS groups are offline, bring them online on all systems:
# /opt/VRTS/bin/hagrp -online
group -sys
node_name
-
Repeat steps in Freeze service group operations (phased or full) and Performing the upgrade (phased or full) for rest of nodes to be upgraded.