Migrating from Oracle10gR1 to Oracle 10.2.0.1
The migration procedure assumes that the beginning configuration includes the following are up and running on the cluster nodes:
-
Storage Foundation for Oracle RAC 5.0
-
Oracle 10gR1
Tasks for Migration:
-
Pre-Upgrade tasks
-
Upgrade Tasks
-
Post-upgrade Tasks