Completing pre-upgrade tasks
To complete pre-upgrade tasks
-
Upgrade the OS and install any patches, if required. Refer to Oracle metalink note 169706.1, "Operating Systems Installation and Configuration Requirements Quick Reference"..
-
Take a hot or cold backup of the existing database
-
Take a backup of the existing Oracle home and central inventory.
-
Shutdown the Oracle instance.
-
Shutdown CRS.