Symantec logo

Completing pre-upgrade tasks

 To complete pre-upgrade tasks

  1. Upgrade the OS and install any patches, if required. Refer to Oracle metalink note 169706.1, "Operating Systems Installation and Configuration Requirements Quick Reference"..
  2. Take a hot or cold backup of the existing database
  3. Take a backup of the existing Oracle home and central inventory.
  4. Shutdown the Oracle instance.
  5. Shutdown CRS.