Symantec logo

Stopping CRS before stopping VCS in Oracle 10g clusters

In SF Oracle RAC clusters with Oracle 10g, stop the CRS daemons before using the hastop -all command to stop VCS. The required sequence of commands is:

  1. Stop Oracle on each node:

    # hagrp -offline oracle_group -sys -system_name

  2. Stop the CRS daemons on each node:

    # /etc/init.d/init.crs stop

  3. Stop VCS. From one node, type:

    # hastop -all

To enable VCS to stop CRS daemons, refer to the information on configuring VCS service groups for Oracle 10g in the Veritas Storage Foundation for Oracle RAC Installation and Configuration Guide.